Working alongside Willmott Dixon to deliver a great project, Morpeth leisure Centre consisted of a full groundworks package including Pool Tank Construction , suspended slabs / soffits , plenums , Radius Retaining Walls, and no dig construction due to tree roots and challenges of working adjacent to the River / flood plain
The Challenge
Restricted access for lifting of formwork to allow the steel frame and upper floor construction to progress, TPO’s therefore no dig zone, Working in close proximity to Wansbeck River.
The Solution
To overcome these challenges, Hewitson Ltd implemented innovative solutions and meticulous planning. An 8-ton excavator was employed as the lifting device for formwork and the construction of the pool tank walls. Upon completion, a temporary works design was prepared, including a scaffold ramp, to safely track the excavator out of the pool through a window opening.
No-dig methods, including the use of Cellweb, were utilized to protect the tree roots within the TPO zones. Detailed Risk Assessment Method Statements (RAMS) and licenses were agreed upon with the Environment Agency to ensure compliance while working within the flood zone.
The Results:
Get in touch with us today
At Hewitson Ltd, we value your feedback and inquiries. Whether you have questions about our products, need support, or want to learn more about our services, our dedicated team is here to assist you. Please fill out the form below, and we will respond promptly. Alternatively, you can reach us via phone or email during our business hours. We look forward to connecting with you!